A can build a structure in 20 days and B can dismantle the same structure in 30 days. If they both work simultaneously continuously, in how many days will the structure be built?
Options:
- A: 40 days
- B: 50 days
- C: 60 days
- D: 120 days
Related Practice Questions:
- Which of the following artifacts, extensively found at Burzahom and Gufkral, specifically indicates that the Neolithic inhabitants of Kashmir practiced sewing animal skins for clothing to survive the harsh winters?
- The earliest known evidence of rock art in India, in the form of 'Cupules' (hemispherical cup-shaped depressions carved into rock), belongs to the Lower Paleolithic age and was found at:
- The first human colonization of the fertile Ganga plains, as evidenced by archaeological discoveries at Sarai Nahar Rai and Mahadaha, took place during which period?
- Which prehistoric site located in the Thar Desert of Rajasthan provides a continuous and undisturbed profile of Lower, Middle, and Upper Paleolithic cultures?
Loading Preview