A can build a wall in 15 days, and B can build the same wall in 20 days. However, C can completely destroy the built wall in 30 days. If all three start working simultaneously, in how many days will the wall be completed?
Options:
- A: 10
- B: 12
- C: 14
- D: 15
Related Practice Questions:
- Let $S_1$ and $S_2$ be two disjoint, non-empty convex sets in $\mathbb{R}^n$. Under which of the following conditions is there guaranteed to exist a hyperplane that strictly separates $S_1$ and $S_2$?
- Let the primal linear programming problem be: Maximize $Z = c^T x$ subject to $Ax \le b, x \ge 0$. If this primal problem has an unbounded optimal objective value, then which of the following statements is always true regarding its dual problem?
- Let $S = \{(x, y) \in \mathbb{R}^2 \mid x^2 + y^2 \le 9\}$ be a convex set in $\mathbb{R}^2$. The set of all extreme points of $S$ is given by:
- In a linear programming problem with $3$ independent equality constraints and $5$ variables (including slack/surplus variables), what is the maximum possible number of basic solutions?