A can do 1/2 of a piece of work in 5 days, B can do 3/5 of the same work in 9 days, and C can do 2/3 of that work in 8 days. In how many days can all of them together do the work?
Options:
- A: 3 days
- B: 4 days
- C: 4.5 days
- D: 5 days
Related Practice Questions:
- Let $S_1$ and $S_2$ be two disjoint, non-empty convex sets in $\mathbb{R}^n$. Under which of the following conditions is there guaranteed to exist a hyperplane that strictly separates $S_1$ and $S_2$?
- Let the primal linear programming problem be: Maximize $Z = c^T x$ subject to $Ax \le b, x \ge 0$. If this primal problem has an unbounded optimal objective value, then which of the following statements is always true regarding its dual problem?
- Let $S = \{(x, y) \in \mathbb{R}^2 \mid x^2 + y^2 \le 9\}$ be a convex set in $\mathbb{R}^2$. The set of all extreme points of $S$ is given by:
- In a linear programming problem with $3$ independent equality constraints and $5$ variables (including slack/surplus variables), what is the maximum possible number of basic solutions?