With reference to the various Public-Private Partnership (PPP) models used in infrastructure projects, consider the following statements: 1. Under the Engineering, Procurement, and Construction (EPC) model, the ownership of the project remains with the government throughout. 2. In the Hybrid Annuity Model (HAM), the private developer has to collect tolls to recover their investment. 3. Under BOT (Toll), the private developer bears the entire commercial and traffic risk. Which of the statements given above are correct?
Options:
- A: 1 and 2 only
- B: 2 and 3 only
- C: 1 and 3 only
- D: 1, 2 and 3
Related Practice Questions:
- Let $S_1$ and $S_2$ be two disjoint, non-empty convex sets in $\mathbb{R}^n$. Under which of the following conditions is there guaranteed to exist a hyperplane that strictly separates $S_1$ and $S_2$?
- Let the primal linear programming problem be: Maximize $Z = c^T x$ subject to $Ax \le b, x \ge 0$. If this primal problem has an unbounded optimal objective value, then which of the following statements is always true regarding its dual problem?
- Let $S = \{(x, y) \in \mathbb{R}^2 \mid x^2 + y^2 \le 9\}$ be a convex set in $\mathbb{R}^2$. The set of all extreme points of $S$ is given by:
- In a linear programming problem with $3$ independent equality constraints and $5$ variables (including slack/surplus variables), what is the maximum possible number of basic solutions?