Adhigo LogoAdhigo LogoAdhigo
AboutContactPrivacyTermsRefunds© Adhigo.
Engineered for Your Exams

Conquer any syllabus with
absolute precision.

India's high-performance interactive learning ecosystem featuring dynamic feeds, intelligent flashcards, and advanced MCQ drills.

?
Mobile OptimizedFor the best experience, open Adhigo on your smartphone.
FeedExploreRevisionProfile

A contractor undertook to finish a road in 40 days and engaged 100 men. After 35 days, he realized the work would be delayed, so he engaged 100 more men and finished the work exactly on time. If he had not engaged the additional men, how many days behind schedule would the work have been completed?

Options:

  • A: 4
  • B: 5
  • C: 6
  • D: 8

Related Practice Questions:

  • Let $S_1$ and $S_2$ be two disjoint, non-empty convex sets in $\mathbb{R}^n$. Under which of the following conditions is there guaranteed to exist a hyperplane that strictly separates $S_1$ and $S_2$?
  • Let the primal linear programming problem be: Maximize $Z = c^T x$ subject to $Ax \le b, x \ge 0$. If this primal problem has an unbounded optimal objective value, then which of the following statements is always true regarding its dual problem?
  • Let $S = \{(x, y) \in \mathbb{R}^2 \mid x^2 + y^2 \le 9\}$ be a convex set in $\mathbb{R}^2$. The set of all extreme points of $S$ is given by:
  • In a linear programming problem with $3$ independent equality constraints and $5$ variables (including slack/surplus variables), what is the maximum possible number of basic solutions?